I shipped 59 lbs. worth of engine parts to Jet-Hot today. I am in the middle of a complete engine rebuild so I figured that while I have the engine out, it's time to really dress it up.
I am painting the block and heads the same color as the outside of the car (maroon) and the following parts will be Jet-Hotted...
- Upper Intake Manifold
- Lower Intake Manifold
- Oil Pan
- Engine Mount brackets
- Front Timing Cover
- 2 Accessory Brackets
- PS Pump Pulley
- Alt Pulley and fan blade
- Tensioner Pulley
- Crank Pulley
- Water Pump Pulley
- AC Eliminator bracket
- Engine lift brackets (on each cylinder head)
For those of you who don't know about Jet-Hot, they do a high temperature, high durability coating that has a high shine attribute like chrome or polished aluminum. I think this combo will look nice with the chrome Edelbrock valve covers, maroon block/heads as well as the bright red MSD coils and yellow Nology Wires.
Gimmie some opinions of what you guys think. I will take some pics when the parts get back which should be 2-3 weeks. By that time, I should have the internal engine parts installed and balanced and ready for the other parts. I will also have an instruction guide for painting your cylinder heads in the next few days.
I am painting the block and heads the same color as the outside of the car (maroon) and the following parts will be Jet-Hotted...
- Upper Intake Manifold
- Lower Intake Manifold
- Oil Pan
- Engine Mount brackets
- Front Timing Cover
- 2 Accessory Brackets
- PS Pump Pulley
- Alt Pulley and fan blade
- Tensioner Pulley
- Crank Pulley
- Water Pump Pulley
- AC Eliminator bracket
- Engine lift brackets (on each cylinder head)
For those of you who don't know about Jet-Hot, they do a high temperature, high durability coating that has a high shine attribute like chrome or polished aluminum. I think this combo will look nice with the chrome Edelbrock valve covers, maroon block/heads as well as the bright red MSD coils and yellow Nology Wires.
Gimmie some opinions of what you guys think. I will take some pics when the parts get back which should be 2-3 weeks. By that time, I should have the internal engine parts installed and balanced and ready for the other parts. I will also have an instruction guide for painting your cylinder heads in the next few days.
Comment